

{"id":5089,"date":"2025-09-02T05:48:37","date_gmt":"2025-09-02T05:48:37","guid":{"rendered":"https:\/\/logisticsbid.com\/ph\/?p=5089"},"modified":"2025-09-08T06:53:16","modified_gmt":"2025-09-08T06:53:16","slug":"dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact","status":"publish","type":"post","link":"https:\/\/logisticsbid.com\/ph\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact\/","title":{"rendered":"DPWH Ensures Increased Load Limit on San Juanico Bridge: Restoration Plan and Its Impact"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-5090 lazyload\" data-src=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2025\/09\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og.jpg\" alt=\"dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og\" width=\"1200\" height=\"630\" data-srcset=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2025\/09\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og.jpg 1200w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2025\/09\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og-300x158.jpg 300w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2025\/09\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og-1024x538.jpg 1024w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2025\/09\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og-768x403.jpg 768w\" data-sizes=\"(max-width: 1200px) 100vw, 1200px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1200px; --smush-placeholder-aspect-ratio: 1200\/630;\" \/><noscript><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-5090\" src=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2025\/09\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og.jpg\" alt=\"dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og\" width=\"1200\" height=\"630\" srcset=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2025\/09\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og.jpg 1200w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2025\/09\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og-300x158.jpg 300w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2025\/09\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og-1024x538.jpg 1024w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2025\/09\/dpwh-ensures-increased-load-limit-on-san-juanico-bridge-restoration-plan-and-its-impact-og-768x403.jpg 768w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/noscript><\/p>\n<p>The Department of Public Works and Highways (DPWH) has made public a detailed proposal to raise the load capacity on the famous <strong>San Juanico Bridge<\/strong> from three tons to a goal range of 12 to 15 tons by December 2025. This project is necessary since the bridge is the only permanent land connection between Samar and Leyte. It needs to be fully operational again as soon as possible, while also making sure that public safety and regional connectivity are maintained during the continuing repair work.<\/p>\n<h2 style=\"font-size: 22px;color: #373a3c\"><b>What Is Driving the Restoration and Capacity Increase Effort?<\/b><\/h2>\n<div style=\"width: 100%;height: 2px;background-color: black;margin-top: 1%;margin-bottom: 1%\"><\/div>\n<h3 style=\"font-size: 18px;color: #373a3c\"><b>The Strategic Importance of San Juanico Bridge<\/b><\/h3>\n<p>The DPWH&#8217;s plan shows how important the San Juanico Bridge is to the strategy. It is a key piece of infrastructure that connects the provinces of Leyte and Samar. This bridge is now limited to a 3-ton <strong>load limit<\/strong>, which has caused significant problems for both passenger and commercial traffic. According to recent statements by the DPWH and backed by data from the agency, the bridge\u2019s rehabilitation and capacity expansion are crucial to restoring inter-island connectivity and economic flow.<\/p>\n<p>Key points include:<\/p>\n<ul>\n<li>Ability to safely increase load limit from 3 tons to 12\u201315 tons<\/li>\n<li>Ongoing portal shoring works are currently at 20.60% completion<\/li>\n<li>Reinforcement of safety protocols such as checkpoints, one-way traffic control, and 24\/7 monitoring<\/li>\n<\/ul>\n<p>This focus on rapid capacity enhancement has been emphasized in recent reports by industry leaders and government agencies, ensuring that both safety and operational readiness are prioritized.<\/p>\n<h2 style=\"font-size: 22px;color: #373a3c\"><b>How Will Portal Shoring Work Contribute to Increased Load Limits?<\/b><\/h2>\n<div style=\"width: 100%;height: 2px;background-color: black;margin-top: 1%;margin-bottom: 1%\"><\/div>\n<h3 style=\"font-size: 18px;color: #373a3c\"><b>Portal Shoring: The Most Practical and Fast Option<\/b><\/h3>\n<p>The portal shoring works conducted beneath the San Juanico Bridge are designed as a temporary yet effective measure to boost load capacity. By reinforcing the bridge structure, these works allow the DPWH to achieve the ambitious target without waiting for the complete rehabilitation phase to be finalized. Recent progress indicates that with the portal shoring already 20.60% complete, the efforts will facilitate safe traffic flow well before full structural rehabilitation is implemented.<\/p>\n<p>Supporting evidence shows that:<\/p>\n<ul>\n<li>DPWH and participating contractors are coordinating a rapid response to the technical challenges.<\/li>\n<li>Studies and comparative analyses by infrastructure experts highlight shoring techniques as cost-effective and quick in providing structural reinforcement.<\/li>\n<li>Safety measures remain in place during the transitional period to safeguard public welfare.<\/li>\n<\/ul>\n<p>These findings have been confirmed by local engineering reviews and government reports, positioning shoring as a critical interim solution before the extensive rehabilitation phase.<\/p>\n<h2 style=\"font-size: 22px;color: #373a3c\"><b>What About the Funding and Rehabilitation Plans?<\/b><\/h2>\n<div style=\"width: 100%;height: 2px;background-color: black;margin-top: 1%;margin-bottom: 1%\"><\/div>\n<h3 style=\"font-size: 18px;color: #373a3c\"><b>Financial Allocations and Additional Resource Requests<\/b><\/h3>\n<p>Multifaceted funding strategies support the restoration plan for the San Juanico Bridge. A key component of the rehabilitation is a P520 million allocation from the National Disaster Risk Reduction and Management Fund (NDRRMF), which will be used for comprehensive structural improvements. However, recognizing the urgency for continuous work, DPWH Region VIII has also requested an additional P651.821 million to address other necessary repairs beyond the rehabilitation project.<\/p>\n<p>Notable funding highlights include:<\/p>\n<ul>\n<li>P520 million secured from NDRRMF for primary rehabilitation<\/li>\n<li>Additional P651.821 million sought to ensure uninterrupted repair works<\/li>\n<li>Strong endorsement from regional government agencies and stakeholders, including coordination with the Traffic Management Committee.<\/li>\n<\/ul>\n<p>This strategy ensures that the bridge\u2019s safety and functionality improvements are both immediate and sustained, as reported by government spokespersons and infrastructure policymakers.<\/p>\n<h2 style=\"font-size: 22px;color: #373a3c\"><b>How Will the Increased Load Limit Impact Regional Connectivity?<\/b><\/h2>\n<div style=\"width: 100%;height: 2px;background-color: black;margin-top: 1%;margin-bottom: 1%\"><\/div>\n<h3 style=\"font-size: 18px;color: #373a3c\"><b>Enhancing Traffic Flow and Economic Impact<\/b><\/h3>\n<p>Increasing the load limit to 12\u201315 tons will significantly improve traffic dynamics and economic connectivity between Leyte and Samar. The current 3-ton limit has led to considerable disruptions, affecting local trade and passenger movement. The restoration project, including both the portal shoring and full rehabilitation, is expected to restore efficient cargo transport as well as daily commuting.<\/p>\n<p>Practical outcomes include:<\/p>\n<ul>\n<li>Improved cargo load capabilities that will reduce logistical delays<\/li>\n<li>Strengthened regional commerce, benefiting local economies<\/li>\n<li>Enhanced safety measures that reassure public and private sector stakeholders<\/li>\n<\/ul>\n<p>According to a statement by the DPWH, the united efforts of the national government, partner agencies, and other stakeholders have been instrumental in expediting this process. Recent directives from President Ferdinand Marcos, Jr. further highlight the government\u2019s dedication to restoring one of the country\u2019s most critical infrastructure links.<\/p>\n<h2 style=\"font-size: 22px;color: #373a3c\"><b>What Are the Future Implications and Next Steps?<\/b><\/h2>\n<div style=\"width: 100%;height: 2px;background-color: black;margin-top: 1%;margin-bottom: 1%\"><\/div>\n<h3 style=\"font-size: 18px;color: #373a3c\"><b>Implementing Safety Protocols and Long-Term Rehabilitation<\/b><\/h3>\n<p>The comprehensive plan for the San Juanico Bridge not only focuses on immediate capacity increases but also sets the stage for a long-term infrastructure overhaul. DPWH\u2019s approach ensures that:<\/p>\n<ul>\n<li>Temporary shoring measures bridge the gap until the full rehabilitation is complete<\/li>\n<li>Permanent enhancements will improve the load capacity beyond current limits in subsequent years<\/li>\n<li>Ongoing monitoring and coordination will continue to safeguard the bridge during high traffic volumes<\/li>\n<\/ul>\n<p>Looking ahead, the restoration strategy integrates the latest engineering techniques and continuous safety evaluations, as recommended by various academic institutions and engineering bodies, to ensure both current and future demands are met.<\/p>\n<h2 style=\"font-size: 22px;color: #373a3c\"><b>How Will the Increased Load Limit Affect Transportation?<\/b><\/h2>\n<div style=\"width: 100%;height: 2px;background-color: black;margin-top: 1%;margin-bottom: 1%\"><\/div>\n<h3 style=\"font-size: 18px;color: #373a3c\"><b>Enhanced Traffic Flow and Reduced Congestion<\/b><\/h3>\n<p>Increasing the load limit on the San Juanico Bridge means that larger vehicles, including heavy-duty trucks and multi-modal cargo carriers, can use the bridge safely. Currently, the 3-ton restriction has contributed to significant delays and congestion, disrupting route planning and causing frequent bottlenecks. With the new capacity:<\/p>\n<ul>\n<li>Transportation agencies anticipate smoother traffic flow.<\/li>\n<li>Freight movement between Samar and Leyte is expected to see a notable reduction in transit times.<\/li>\n<li>The overall efficiency for road users will improve.<\/li>\n<\/ul>\n<p>Data from DPWH and recent <a style=\"color: grey;text-decoration: none\" href=\"\/ph\/sona-on-road-and-transport-infrastructure-development\/\">local transportation studies<\/a> suggest that refined load capacity could reduce travel times by as much as 20%, underscoring the potential for economic benefits and enhanced service reliability.<\/p>\n<h2 style=\"font-size: 22px;color: #373a3c\"><b>What Impact Does This Have on Delivery Services and Logistics?<\/b><\/h2>\n<div style=\"width: 100%;height: 2px;background-color: black;margin-top: 1%;margin-bottom: 1%\"><\/div>\n<h3 style=\"font-size: 18px;color: #373a3c\"><b>Accelerated Delivery Times and Broader Operational Scope<\/b><\/h3>\n<p>The lift in the bridge\u2019s load limit holds significant promise for the logistics and delivery sector. Delivery companies often face rigid scheduling due to load constraints and regulatory limits, which have traditionally hampered the movement of larger shipments over the San Juanico Bridge. The increased capacity will:<\/p>\n<ul>\n<li>Enable higher volume shipments, reducing the frequency of trips for the same amount of cargo.<\/li>\n<li>Decrease operational overhead and lower transit costs across the region.<\/li>\n<li>Optimize routing strategies for logistics players operating in and out of Samar and Leyte.<\/li>\n<\/ul>\n<p>Authoritative sources, such as industry research from logistics consultancies (2023), report that improved infrastructural efficiency can lead to delivery cost cuts of up to 15%, while enhancing service reliability in <a style=\"color: grey;text-decoration: none\" href=\"\/ph\/explore-grab-motorcycle-delivery-areas-features-and-business-benefits\/\">regional delivery networks<\/a>.<\/p>\n<h2 style=\"font-size: 22px;color: #373a3c\"><b>Which Logistics Players Stand to Benefit?<\/b><\/h2>\n<div style=\"width: 100%;height: 2px;background-color: black;margin-top: 1%;margin-bottom: 1%\"><\/div>\n<p>Key players in the logistics sector have expressed optimism about the transport improvements. Service providers that operate regionally can capitalize on these developments. For instance:<\/p>\n<ul>\n<li>Major <a style=\"color: grey;text-decoration: none\" href=\"\/ph\/philippines-logistics-industry-eleven-percent-growth-in-three-months\/\">logistics companies<\/a>, known for trucking and heavy cargo services, are poised to benefit from reduced turnaround times.<\/li>\n<\/ul>\n<h3 style=\"font-size: 18px;color: #373a3c\"><b>LBC Express<\/b><\/h3>\n<table style=\"border-collapse: collapse;max-width: 100%;width: 100%\">\n<tbody>\n<tr>\n<td style=\"width: 10%\"><\/td>\n<td style=\"width: 40%\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-3432 lazyload\" data-src=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2024\/04\/lbc-we-like-to-move-it-logo-og.png\" alt=\"lbc-we-like-to-move-it-logo-og\" width=\"800\" height=\"300\" data-srcset=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2024\/04\/lbc-we-like-to-move-it-logo-og.png 800w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2024\/04\/lbc-we-like-to-move-it-logo-og-300x113.png 300w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2024\/04\/lbc-we-like-to-move-it-logo-og-768x288.png 768w\" data-sizes=\"(max-width: 800px) 100vw, 800px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 800px; --smush-placeholder-aspect-ratio: 800\/300;\" \/><noscript><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-3432\" src=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2024\/04\/lbc-we-like-to-move-it-logo-og.png\" alt=\"lbc-we-like-to-move-it-logo-og\" width=\"800\" height=\"300\" srcset=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2024\/04\/lbc-we-like-to-move-it-logo-og.png 800w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2024\/04\/lbc-we-like-to-move-it-logo-og-300x113.png 300w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2024\/04\/lbc-we-like-to-move-it-logo-og-768x288.png 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/noscript><\/td>\n<td style=\"width: 50%\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Already renowned for its efficient courier services, <a style=\"color: grey;text-decoration: none\" href=\"https:\/\/www.lbcexpress.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">LBC Express<\/a> stands to enhance its freight division with the improved bridge capacity. This can lead to a more streamlined transport process for heavy and bulk consignments, benefiting small local businesses and large enterprises across the region.<\/p>\n<h3 style=\"font-size: 18px;color: #373a3c\"><b>Transportify<\/b><\/h3>\n<table style=\"border-collapse: collapse;max-width: 100%;width: 100%\">\n<tbody>\n<tr>\n<td style=\"width: 10%\"><\/td>\n<td style=\"width: 40%\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4832 lazyload\" data-src=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2020\/08\/transportify-philippines-logo.jpg\" alt=\"transportify-philippines-logo\" width=\"770\" height=\"160\" data-srcset=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2020\/08\/transportify-philippines-logo.jpg 770w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2020\/08\/transportify-philippines-logo-300x62.jpg 300w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2020\/08\/transportify-philippines-logo-768x160.jpg 768w\" data-sizes=\"(max-width: 770px) 100vw, 770px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 770px; --smush-placeholder-aspect-ratio: 770\/160;\" \/><noscript><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4832\" src=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2020\/08\/transportify-philippines-logo.jpg\" alt=\"transportify-philippines-logo\" width=\"770\" height=\"160\" srcset=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2020\/08\/transportify-philippines-logo.jpg 770w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2020\/08\/transportify-philippines-logo-300x62.jpg 300w, https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2020\/08\/transportify-philippines-logo-768x160.jpg 768w\" sizes=\"(max-width: 770px) 100vw, 770px\" \/><\/noscript><\/td>\n<td style=\"width: 50%\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><a style=\"color: grey;text-decoration: none\" href=\"https:\/\/www.transportify.com.ph\/\" target=\"_blank\" rel=\"noopener noreferrer\">Transportify<\/a>, which serves the Samar and Leyte corridor, can leverage the <strong>increased load<\/strong> limit to enhance their operational capabilities. By accommodating larger loads, Transportify may offer more efficient scheduling and improved delivery times without compromising on safety.<\/p>\n<h3 style=\"font-size: 18px;color: #373a3c\"><b>2GO<\/b><\/h3>\n<table style=\"border-collapse: collapse;max-width: 100%;width: 100%\">\n<tbody>\n<tr>\n<td style=\"width: 10%\"><\/td>\n<td style=\"width: 40%\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1672 lazyload\" data-src=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2021\/07\/2go-e1627481508933.png\" alt=\"2GO Express Logo\" width=\"300\" height=\"160\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 300px; --smush-placeholder-aspect-ratio: 300\/160;\" \/><noscript><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1672\" src=\"https:\/\/logisticsbid.com\/ph\/wp-content\/uploads\/sites\/6\/2021\/07\/2go-e1627481508933.png\" alt=\"2GO Express Logo\" width=\"300\" height=\"160\" \/><\/noscript><\/td>\n<td style=\"width: 50%\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>As one of the key players in domestic cargo and passenger logistics, <a style=\"color: grey;text-decoration: none\" href=\"https:\/\/2go.com.ph\/\" target=\"_blank\" rel=\"noopener noreferrer\">2GO Express<\/a> may leverage the enhanced load capacity to improve their scheduling and reduce delays. The expanded capacity fits well with their broader logistics strategy aimed at boosting efficiency and reducing turnaround times.<\/p>\n<p>Other players in the logistics field, including those involved in international freight and <a style=\"color: grey;text-decoration: none\" href=\"\/ph\/how-the-20-percent-trump-tariff-on-philippine-exports-to-the-us-is-disrupting-the-supply-chain\/\">regional supply chain<\/a> management, are also expected to notice an uptick in service efficiency thanks to better connectivity and strengthened transport links.<\/p>\n<p>The initiative led by the DPWH to boost the San Juanico Bridge\u2019s load limit is a critical step towards revitalizing a major transport artery between Samar and Leyte. By integrating innovative shoring techniques with strategic funding and comprehensive safety measures, this project is set to restore essential connectivity and stimulate regional economic activity. With continuous updates from government agencies and coordinated efforts among stakeholders, the <a style=\"color: grey;text-decoration: none\" href=\"https:\/\/portcalls.com\/dpwh-guarantees-hike-in-san-juanico-bridge-load-limit-by-yearend\/\">San Juanico Bridge<\/a>\u2019s transformation marks a promising future for infrastructure development in the region. Stakeholders and commuters alike can look forward to improved travel conditions and a more resilient structural network that will support long-term growth.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Department of Public Works and Highways (DPWH) has made public a detailed proposal to raise the load capacity on the famous San Juanico Bridge from three tons to a goal range of 12 to 15 tons by December 2025. This project is necessary since the bridge is the only permanent land connection between Samar [&hellip;]<\/p>\n","protected":false},"author":25514,"featured_media":5090,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,7],"tags":[84,82,30],"class_list":["post-5089","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","category-transportation","tag-2go","tag-lbc-express","tag-transportify"],"acf":[],"_links":{"self":[{"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/posts\/5089"}],"collection":[{"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/users\/25514"}],"replies":[{"embeddable":true,"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/comments?post=5089"}],"version-history":[{"count":4,"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/posts\/5089\/revisions"}],"predecessor-version":[{"id":5094,"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/posts\/5089\/revisions\/5094"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/media\/5090"}],"wp:attachment":[{"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/media?parent=5089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/categories?post=5089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/logisticsbid.com\/ph\/wp-json\/wp\/v2\/tags?post=5089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}